4/18/2023 0 Comments Network radar 2.3.1June, 10, 2019-Engineering Technical Order: Removal of X.25 Communications Equipment in the Radar Product Generator (RPG), Modification Note 198. August 1, 2019-Radar Product Generator (RPG) Group Software Update 18.2. August 1, 2019-RDA Group Software Update 18.2, Software Note 161. To download, install and use Network Radar, your iPhone, iPad, or iPod Touch will need to be on iOS 12.0 or higher that have at least 16 MB of free phone memory. The application Network Radar was published in the category Utilities on and was developed by Daniel Witt. That budget should estimate costs across project components or tasks, including an identification of funding sources and amounts.Įxceptions to anticipated award terms and conditions & pre-existing intellectual property and data rights.Radar Geographic Information Systems (GIS) Interactive Map. Standard Form 424B – Assurances for non-construction programsĮvidence of stable and reliable fund commitments sufficient to cover estimated costs including required non-Federal matching costs, letters of commitment included in Section D of this VolumeĮvidence of the financial condition of the project sponsorĮvidence of the grant recipient's ability to manage grantsĭetailed budget containing a breakdown of how the funds will be spent. Standard Form 424A – Budget information for non-construction programs with Sections A through E completed. Volume 2 – Budget Application (separate PDF file) A)Ěpplication Standard Forms (SFs) – entered into package Performance Improvement Metrics: Data Model Summary Mean Texture Depth Measured at Traffic Speed for Friction Prediction In-Traffic Multi Sensor Bridge Deck Inspection System Description Pavement Strength & Remaining Life Evaluation Using TSD & GPR Integration with ITS Program or Innovative Technology Initiatives Plan to Leverage and Optimize Existing Resources Plan to Partner with Private Sector and Public Agencies Savings in Direct and Indirect Fuel Use and Emissions Quantification for Safety, Mobility, and Traffic Projections Quantifiable System Performance Improvements Regulatory, Legislative, Institutional Challenges - Bringing Down the Barriers Technology Feasibility Studies to Strengthen and Support Evaluation In-Traffic Multi-Sensor Bridge Deck Inspection System (NW-PI) Traffic Speed Deflectometer System for Network-Wide Pavement Structure Evaluation (NW-PSE) Surface Radar-Based IRI System for Pavement Inspection (NW-PI) Scope of Transportation Systems and Services to be Included in the Project Real-World Issues, Challenges, and Opportunities Introduction - Summary of the Project and Technology DeploymentĪ Partnership via the Northeast SMART Infrastructure Consortiumĭescription of the Geographic Area that the Northeast SMART Infrastructure Consortium will Serve Table of Contents Volume 1– Technical Application You may need the Adobe® Reader® to view the PDFs on this page.Ĭontact Information: Operations Feedback at Department of Transportation ATCMTD Applications - FY 2017 Volume 1 - Technical Application: Transcending Boundaries with Surveillance, Monitoring and Action for Resilient Transportation (SMART) Infrastructure via Integrated Network-Wide Management
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |